Contact

Post:

REPUBLIC OF SINGAPORE
AERONAUTICAL INFORMATION SERVICES
CIVIL AVIATION AUTHORITY OF SINGAPORE
SINGAPORE CHANGI AIRPORT
P.O. BOX 1, SINGAPORE 918141

Tel: (65) 6422 7036

AFS: WSSSYNYX

Fax: (65) 64410221

Email: caas_singaporeais@caas.gov.sg

URL: www.caas.gov.sg

URL: https://aim-sg.caas.gov.sg

AIP Supplement for Singapore

Civil Aviation Authority Singapore

AIRAC AIP SUP

019/2024

Effective from 21 MAR 2024

PERM

Published on 11 JAN 2024

DEPARTURE, ARRIVAL AND APPROACH PROCEDURES FOR SINGAPORE CHANGI AIRPORT

1 INTRODUCTION

1.1 This AIP Supplement informs aircraft operators and pilots of revisions to existing and implementation of new departure, arrival and approach procedures for Singapore Changi Airport, effective from 21 March 2024, 2000UTC.

1.2 To facilitate the flow of traffic, the new and revised departure, arrival and approach procedures for Singapore Changi Airport are as follows:
  1. Revised RNAV-1 SIDs for departures on Runway 02L/20R and 02C/20C;
  2. New RNAV-1 SIDs for departures on Runway 02L/20R, 02C/20C and 02R/20L;
  3. New and revised RNAV-1 STARs to serve Runway Direction 02 and 20;
  4. Revised Holding Areas; and
  5. New ILS Approach Procedure - ICX ILS/DME Runway 02R.

1.3 The departure and arrival procedures has been designed in accordance with criteria stipulated in the ICAO PANS-OPS (Doc 8168) Volume II and ICAO Manual of PBN (Doc 9613) and ICAO Quality Assurance Manual for Flight Procedure Design (Doc 9906).

2 REVISION TO DEPARTURE, ARRIVAL AND APPROACH PROCEDURES

2.1 Revised RNAV-1 SIDs for departures on Runway 02L/20R and 02C/20C

2.1.1 The revised Changi Instrument Flight Procedure (IFP) SID charts (refer to Appendix A) will supersede those published in AIP Singapore, section WSSS AD 2.24. The coordinates of the SID waypoints will be updated and supersede those published in AIP Singapore, section WSSS AD 2.22.

Revised SIDExisting SIDAIP ReferenceAIP SUP Reference
MERSING 6AMERSING 5A/8BAD-2-WSSS-SID-14 to 14.1Appendix A-1 to A-1.1
MERSING 9BMERSING 5A/8BAD-2-WSSS-SID-14 to 14.1Appendix A-2 to A-2.1
MERSING 6EMERSING 5E/8FAD-2-WSSS-SID-13 to 13.1Appendix A-3 to A-3.1
MERSING 9FMERSING 5E/8FAD-2-WSSS-SID-13 to 13.1Appendix A-4 to A-4.1
TOMAN 3ATOMAN 2A/4BAD-2-WSSS-SID-6 to 6.1Appendix A-5 to A-5.1
TOMAN 5BTOMAN 2A/4BAD-2-WSSS-SID-6 to 6.1Appendix A-6 to A-6.1
TOMAN 3ETOMAN 2E/4FAD-2-WSSS-SID-5 to 5.1Appendix A-7 to A-7.1
TOMAN 5FTOMAN 2E/4FAD-2-WSSS-SID-5 to 5.1Appendix A-8 to A-8.1
AROSO 3AAROSO 2A/4BAD-2-WSSS-SID-11 to 11.1Appendix A-9 to A-9.1
AROSO 5BAROSO 2A/4BAD-2-WSSS-SID-11 to 11.1Appendix A-10 to A-10.1
AROSO 3EAROSO 2E/4FAD-2-WSSS-SID-9 to 9.1Appendix A-11 to A-11.1
AROSO 5FAROSO 2E/4FAD-2-WSSS-SID-9 to 9.1Appendix A-12 to A-12.1
MASBO 3AMASBO 2A/4BAD-2-WSSS-SID-12 to 12.1Appendix A-13 to A-13.1
MASBO 5BMASBO 2A/4BAD-2-WSSS-SID-12 to 12.1Appendix A-14 to A-14.1
MASBO 3EMASBO 2E/4FAD-2-WSSS-SID-10 to 10.1Appendix A-15 to A-15.1
MASBO 5FMASBO 2E/4FAD-2-WSSS-SID-10 to 10.1Appendix A-16 to A-16.1
ANITO 7AANITO 6A/7BAD-2-WSSS-SID-2 to 2.1Appendix A-17 to A-17.1
ANITO 8BANITO 6A/7BAD-2-WSSS-SID-2 to 2.1Appendix A-18 to A-18.1
ANITO 7EANITO 6E/7FAD-2-WSSS-SID-1 to 1.1Appendix A-19 to A-19.1
ANITO 8FANITO 6E/7FAD-2-WSSS-SID-1 to 1.1Appendix A-20 to A-20.1

2.2 New RNAV-1 SIDs for departures on Runway 02L/20R, 02C/20C and 02R/20L

2.2.1 New RNAV-1 SIDs are designed for Changi Runways 02L, 20R, 02C, 20C, 02R and 20L (refer to Appendix B) and will be published in AIP Singapore, section WSSS AD 2.24. Minimum climb gradient for aircraft departing from Runways 02L, 02C and 02R shall be 5% up to 2500FT, thereafter 3.3%, regardless on SID or vectors.

2.2.2 ADMIM SIDs will be replaced with TAROS and MIBEL SIDs. VENIX SIDs will be replaced with IDBUD SIDs. BAVUS and KADAR SIDs will be replaced with DODSO SIDs. Departures from Changi on IDBUD SID are to flight plan IDBUD T24 to SURGA. Departures from Changi on DODSO SID are to flight plan DODSO T21 OBDOS to KADAR or BAVUS.

2.2.3 AROSO and MASBO SIDs will be the default SID for all departures from Changi towards AROSO Y513 and SABKA A457 respectively. VOVOS SID will not be available for flight planning for departures on Runway 20R, 20C and 20L until further advised.

New SIDExisting SIDAIP SUP Reference
IDBUD 1AVENIX 1AAppendix B-1 to B-1.1
IDBUD 1BVENIX 3BAppendix B-2 to B-2.1
IDBUD 1C-Appendix B-3 to B-3.1
IDBUD 1D-Appendix B-4 to B-4.1
IDBUD 1EVENIX 1EAppendix B-5 to B-5.1
IDBUD 1FVENIX 3FAppendix B-6 to B-6.1
TAROS 1AADMIM 1AAppendix B-7 to B-7.1
TAROS 1BADMIM 3BAppendix B-8 to B-8.1
TAROS 1C-Appendix B-9 to B-9.1
TAROS 1D-Appendix B-10 to B-10.1
TAROS 1EADMIM 1EAppendix B-11 to B-11.1
TAROS 1FADMIM 3FAppendix B-12 to B-12.1
MIBEL 1AADMIM 1AAppendix B-13 to B-13.1
MIBEL 1BADMIM 3BAppendix B-14 to B-14.1
MIBEL 1C-Appendix B-15 to B-15.1
MIBEL 1D-Appendix B-16 to B-16.1
MIBEL 1EADMIM 1EAppendix B-17 to B-17.1
MIBEL 1FADMIM 3FAppendix B-18 to B-18.1
DODSO 1ABAVUS 1A & KADAR 1AAppendix B-19 to B-19.1
DODSO 1BBAVUS 3B & KADAR 3BAppendix B-20 to B-20.1
DODSO 1C-Appendix B-21 to B-21.1
DODSO 1D-Appendix B-22 to B-22.1
DODSO 1EBAVUS 1E & KADAR 1EAppendix B-23 to B-23.1
DODSO 1FBAVUS 3F & KADAR 3FAppendix B-24 to B-24.1
KIRDA 1A-Appendix B-25 to B-25.1
KIRDA 1B-Appendix B-26 to B-26.1
KIRDA 1C-Appendix B-27 to B-27.1
KIRDA 1D-Appendix B-28 to B-28.1
KIRDA 1E-Appendix B-29 to B-29.1
KIRDA 1F-Appendix B-30 to B-30.1
TOMAN 1C-Appendix B-31 to B-31.1
TOMAN 1D-Appendix B-32 to B-32.1
ANITO 1C-Appendix B-33 to B-33.1
ANITO 1D-Appendix B-34 to B-34.1
VOVOS 1B-Appendix B-35 to B-35.1
VOVOS 1D-Appendix B-36 to B-36.1
VOVOS 1F-Appendix B-37 to B-37.1
MERSING 1C-Appendix B-38 to B-38.1
MERSING 1D-Appendix B-39 to B-39.1
AROSO 1C-Appendix B-40 to B-40.1
AROSO 1D-Appendix B-41 to B-41.1
MASBO 1C-Appendix B-42 to B-42.1
MASBO 1D-Appendix B-43 to B-43.1

2.3 New and revised RNAV-1 STARs to serve Runway Direction 02 and 20

2.3.1 The revised Changi Instrument Flight Procedure (IFP) STAR charts (refer to Appendix C) will supersede those published in AIP Singapore, section WSSS AD 2.24. The coordinates of the new STAR waypoints will be updated and supersede those published in AIP Singapore, section WSSS AD 2.22.

2.3.2 OBDOS and SURGA STARs will be replaced with UGEBO STAR. Arrivals into Changi via BAVUS L504 OBDOS M774 and KADAR M774 are to flight plan OBDOS T22 UGEBO to join the UGEBO STAR. Arrivals into Changi via M635 are to flight plan SURGA T23 UGEBO to join the UGEBO STAR.

2.3.3 ARAMA STAR is not available for flight planning. Arrivals into Changi via A464 are to flight plan ARAMA direct to TEBUN to join the TEBUN STAR.

2.3.4 The Changi IFP STARs were designed to be only runway direction specific (i.e. they do not serve a specific runway for the given direction). Pilots can expect ATC vectors to the respective Instrument Approach Procedures (IAPs) before reaching the last waypoint on the STAR.

Revised / New STARExisting STARAIP ReferenceAIP SUP Reference
ASUNA 2AASUNA 1AAD-2-WSSS-STAR-2 to 2.1Appendix C-1 to C-1.1
ASUNA 2BASUNA 1BAD-2-WSSS-STAR-4 to 4.1Appendix C-2 to C-2.1
KARTO 2AKARTO 1AAD-2-WSSS-STAR-5 to 5.1Appendix C-3 to C-3.1
KARTO 2BKARTO 1BAD-2-WSSS-STAR-7 to 7.1Appendix C-4 to C-4.1
LEBAR 3BLEBAR 2BAD-2-WSSS-STAR-15 to 15.1Appendix C-5 to C-5.1
REPOV 2AREPOV 1AAD-2-WSSS-STAR-16 to 16.1Appendix C-6 to C-6.1
REPOV 2BREPOV 1BAD-2-WSSS-STAR-18 to 18.1Appendix C-7 to C-7.1
TEBUN 1A--Appendix C-8 to C-8.1
TEBUN 1B--Appendix C-9 to C-9.1
UGEBO 1A--Appendix C-10 to C-10.1
UGEBO 1B--Appendix C-11 to C-11.1

2.4 Revised Holding Areas

2.4.1 Existing holding areas at LAVAX and IKIMA as specified in AIP Singapore, ENR 3.6, will be removed.

2.4.2 Three new holding areas will be promulgated in AIP Singapore, ENR 3.6, as follows:

  1. For TEBUN and ASUNA STARs, VAMPO Holding Area – Lower/Upper limits – 6000FT/FL180
  2. For KARTO and UGEBO STARs, KEXAS Holding Area – Lower/Upper limits – 11000FT/FL160
  3. For UGEBO STARs, UGEBO Holding Area – Lower/Upper limits – FL170/FL310

2.4.3 Existing holding area, REMES will be revised to a Left-Hand Hold.

2.5 New ILS Approach Procedure - ICX ILS/DME Runway 02R

2.5.1 The Instrument Landing System (ILS) approach procedure for Runway 02R can be found in Appendix D of this AIP Supplement as follows:

Instrument Approach ProcedureAIP SUP Reference
ICX ILS/DME Runway 02RAppendix D-1

2.5.2 Aircraft operators and pilots must possess the necessary operational approvals to conduct ILS operations from their respective State authorities to carry out the procedure.

2.5.3 While the Instrument Landing System (ILS) approach procedure for Runway 02R had been developed, Runway 02R/20L has been closed from 30 November 2023, 2000UTC (see AIRAC AIP SUP 138/2023).

2.6 Other Changes to AIP Singapore

2.6.1 Other changes associated with changes to Changi IFPs will be amended accordingly in the relevant sections of AIP Singapore.

3 CANCELLATION

3.1 This AIP Supplement will be cancelled when the contents are incorporated into AIP Singapore.

MERSING 6A
PDF
MERSING 6A - Descriptions
PDF
MERSING 9B
PDF
MERSING 9B - Descriptions
PDF
MERSING 6E
PDF
MERSING 6E - Descriptions
PDF
MERSING 9F
PDF
MERSING 9F - Descriptions
PDF
TOMAN 3A
PDF
TOMAN 3A - Descriptions
PDF
TOMAN 5B
PDF
TOMAN 5B - Descriptions
PDF
TOMAN 3E
PDF
TOMAN 3E - Descriptions
PDF
TOMAN 5F
PDF
TOMAN 5F - Descriptions
PDF
AROSO 3A
PDF
AROSO 3A - Descriptions
PDF
AROSO 5B
PDF
AROSO 5B - Descriptions
PDF
AROSO 3E
PDF
AROSO 3E - Descriptions
PDF
AROSO 5F
PDF
AROSO 5F - Descriptions
PDF
MASBO 3A
PDF
MASBO 3A - Descriptions
PDF
MASBO 5B
PDF
MASBO 5B - Descriptions
PDF
MASBO 3E
PDF
MASBO 3E - Descriptions
PDF
MASBO 5F
PDF
MASBO 5F - Descriptions
PDF
ANITO 7A
PDF
ANITO 7A - Descriptions
PDF
ANITO 8B
PDF
ANITO 8B - Descriptions
PDF
ANITO 7E
PDF
ANITO 7E - Descriptions
PDF
ANITO 8F
PDF
ANITO 8F - Descriptions
PDF
IDBUD 1A
PDF
IDBUD 1A - Descriptions
PDF
IDBUD 1B
PDF
IDBUD 1B - Descriptions
PDF
IDBUD 1C
PDF
IDBUD 1C - Descriptions
PDF
IDBUD 1D
PDF
IDBUD 1D - Descriptions
PDF
IDBUD 1E
PDF
IDBUD 1E - Descriptions
PDF
IDBUD 1F
PDF
IDBUD 1F - Descriptions
PDF
TAROS 1A
PDF
TAROS 1A - Descriptions
PDF
TAROS 1B
PDF
TAROS 1B - Descriptions
PDF
TAROS 1C
PDF
TAROS 1C - Descriptions
PDF
TAROS 1D
PDF
TAROS 1D - Descriptions
PDF
TAROS 1E
PDF
TAROS 1E - Descriptions
PDF
TAROS 1F
PDF
TAROS 1F - Descriptions
PDF
MIBEL 1A
PDF
MIBEL 1A - Descriptions
PDF
MIBEL 1B
PDF
MIBEL 1B - Descriptions
PDF
MIBEL 1C
PDF
MIBEL 1C - Descriptions
PDF
MIBEL 1D
PDF
MIBEL 1D - Descriptions
PDF
MIBEL 1E
PDF
MIBEL 1E - Descriptions
PDF
MIBEL 1F
PDF
MIBEL 1F - Descriptions
PDF
DODSO 1A
PDF
DODSO 1A - Descriptions
PDF
DODSO 1B
PDF
DODSO 1B - Descriptions
PDF
DODSO 1C
PDF
DODSO 1C - Descriptions
PDF
DODSO 1D
PDF
DODSO 1D - Descriptions
PDF
DODSO 1E
PDF
DODSO 1E - Descriptions
PDF
DODSO 1F
PDF
DODSO 1F - Descriptions
PDF
KIRDA 1A
PDF
KIRDA 1A - Descriptions
PDF
KIRDA 1B
PDF
KIRDA 1B - Descriptions
PDF
KIRDA 1C
PDF
KIRDA 1C - Descriptions
PDF
KIRDA 1D
PDF
KIRDA 1D - Descriptions
PDF
KIRDA 1E
PDF
KIRDA 1E - Descriptions
PDF
KIRDA 1F
PDF
KIRDA 1F - Descriptions
PDF
TOMAN 1C
PDF
TOMAN 1C - Descriptions
PDF
TOMAN 1D
PDF
TOMAN 1D - Descriptions
PDF
ANITO 1C
PDF
ANITO 1C - Descriptions
PDF
ANITO 1D
PDF
ANITO 1D - Descriptions
PDF
VOVOS 1B
PDF
VOVOS 1B - Descriptions
PDF
VOVOS 1D
PDF
VOVOS 1D - Descriptions
PDF
VOVOS 1F
PDF
VOVOS 1F - Descriptions
PDF
MERSING 1C
PDF
MERSING 1C - Descriptions
PDF
MERSING 1D
PDF
MERSING 1D - Descriptions
PDF
AROSO 1C
PDF
AROSO 1C - Descriptions
PDF
AROSO 1D
PDF
AROSO 1D - Descriptions
PDF
MASBO 1C
PDF
MASBO 1C - Descriptions
PDF
MASBO 1D
PDF
MASBO 1D - Descriptions
PDF
ASUNA 2A
PDF
ASUNA 2A - Descriptions
PDF
ASUNA 2B
PDF
ASUNA 2B - Descriptions
PDF
KARTO 2A
PDF
KARTO 2A - Descriptions
PDF
KARTO 2B
PDF
KARTO 2B - Descriptions
PDF
LEBAR 3B
PDF
LEBAR 3B - Descriptions
PDF
REPOV 2A
PDF
REPOV 2A - Descriptions
PDF
REPOV 2B
PDF
REPOV 2B - Descriptions
PDF
TEBUN 1A
PDF
TEBUN 1A - Descriptions
PDF
TEBUN 1B
PDF
TEBUN 1B - Descriptions
PDF
UGEBO 1A
PDF
UGEBO 1A - Descriptions
PDF
UGEBO 1B
PDF
UGEBO 1B - Descriptions
PDF
ICX ILS/DME Runway 02R
PDF