CIVIL AVIATION AUTHORITY OF SINGAPOREContactPost: REPUBLIC OF SINGAPORE Tel: (65) 69550400 AFS: WSSSYNYX | AIP Supplement![]() | AIRAC AIP SUP 120/2025 Effective from 04 SEP 2025 to 31 MAR 2027 Published on 24 JUL 2025 |
| Annex A |
WSSS – SINGAPORE/SINGAPORE CHANGI INTL RUNWAY 02L/20R AND RUNWAY 02C/20C CLOSURE SCHEDULES
Details in this Annex should be read in conjunction with AIP Singapore, Section WSSS AD 2.12, Item 14 from 04 September 2025, 1700UTC to 30 September 2025, 2200UTC.
| WSSS AD 2.12 RUNWAY PHYSICAL CHARACTERISTICS |
|---|
| Remarks |
| The information below supersedes the information published in the AIP SINGAPORE, WSSS AD 2.12, Item 14 for the duration of this AIP Supplement. |
| 14 |
| 4) Scheduled Closure of RWY 02L/20R |
a. BTN 1700-2200UTC on every SUN and WED of the month (resurfacing and preventive maintenance work). In the event of an emergency, RWY will be re-opened within 2 hours. b. A 5-minute inspection conducted within the periods BTN 0100-0359UTC 0500-0759UTC 0800-1059UTC daily. |
| 5) Scheduled Closure of RWY 02C/20C |
a. BTN 1800-2200UTC on every TUE and FRI of the month (preventive maintenance work). In the event of an emergency, RWY will be re-opened within 30 minutes. b. A 5-minute inspection conducted within the periods BTN 0100-0359UTC 0500-0759UTC 0800-1059UTC daily. |
| 6) Scheduled Closure of RWY 02R/20L |
| a. Runway 02R/20L is not available for civil use. |
| 7) Additional Inspection and Maintenance Closures |
a. On days when there is a scheduled runway closure BTN 1700-2200UTC or 1800- 2200UTC i. 10-minute inspection conducted within the period BTN 1500-1610UTC on the other operational runway(s)ii.15-minute inspection conducted within the period BTN 2300-2359UTC on the other operational runway(s); iii. 5-minute inspection conducted within period BTN 2300-2359UTC on the re-opened runway. b. On days when there is no scheduled runway closure BTN 1700-2200UTC or 1800-2200UTC I. RWY 02L/20R; i. 5-minute inspection conducted within period BTN 2300-2359UTC ii. 30-minute maintenance will be conducted BTN 1830-1900UTC II. RWY 02C/20C; i. 5-minute inspection conducted within period BTN 2300-2359UTC ii. 30-minute maintenance will be conducted BTN 1930-2000UTC III. RWY 02R/20L; i. Runway 02R/20L is not available for civil use. |
| Annex B |
WSSS – SINGAPORE/SINGAPORE CHANGI INTL RUNWAY 02L/20R AND RUNWAY 02C/20C CLOSURE SCHEDULES
Details in this Annex should be read in conjunction with AIP Singapore, Section WSSS AD 2.12, Item 14 from 30 September 2025, 2201UTC to 31 March 2027, 2130UTC.
| WSSS AD 2.12 RUNWAY PHYSICAL CHARACTERISTICS |
|---|
| Remarks |
| The information below supersedes the information published in the AIP SINGAPORE, WSSS AD 2.12, Item 14 for the duration of this AIP Supplement. |
| 14 |
| 4) Scheduled Closure of RWY 02L/20R |
| a. BTN 1730-2130UTC on every SUN and WED of the month (preventive maintenance work). In the event of an emergency, RWY will be re-opened within 30 minutes. b. A 5-minute inspection conducted within the periods BTN 0100-0359UTC 0500-0759UTC 0800-1059UTC daily. |
| 5) Scheduled Closure of RWY 02C/20C |
| a. BTN 1730-2130UTC on every TUE and FRI of the month (preventive maintenance work). In the event of an emergency, RWY will be re-opened within 30 minutes. b. A 5-minute inspection conducted within the periods BTN 0100-0359UTC 0500-0759UTC 0800-1059UTC daily. |
| 6) Scheduled Closure of RWY 02R/20L |
| a. Runway 02R/20L is not available for civil use. |
| 7) Additional Inspection and Maintenance Closures |
a. On days when there is a scheduled runway closure BTN 1730-2130UTC i. 10-minute inspection conducted within the period BTN 1500-1610UTC on the other operational runway(s)ii.15-minute inspection conducted within the period BTN 2300-2359UTC on the other operational runway(s); iii. 5-minute inspection conducted within period BTN 2300-2359UTC on the re-opened runway. b. On days when there is no scheduled runway closure BTN 1730-2130UTC I. RWY 02L/20R; i. 5-minute inspection conducted within period BTN 2300-2359UTC ii. 30-minute maintenance will be conducted BTN 1830-1900UTC II. RWY 02C/20C; i. 5-minute inspection conducted within period BTN 2300-2359UTC ii. 30-minute maintenance will be conducted BTN 1930-2000UTC III. RWY 02R/20L; i. Runway 02R/20L is not available for civil use. |